Application
Durable, safe, clean and perfect handling.
In this project, it was the high quality of WrapTec in particular that was a decisive factor. The client was confident of the new product’s superior qualities even before the project began – and utterly convinced of them the moment it was completed. Extremely straightforward installation, maximum flexibility, self-welding, minimal logistics and space requirements, plus the sheer speed with which WrapTec was applied meant that the climatic components, insulation and cladding could be replaced virtually without interruption. And without special training, hazardous substances, additional tools or apparatus.
Project size, volume | 50 m2 |
---|---|
Place, country | Bristol, UK |
Context | Replacement of all climatic components, insulation and cladding during ongoing operation |
Application | Insulated pipes for extraction of moist air |
Influence of ambient conditions | No influences due to inhouse installation |
Insulating material | Mineral wool with laminated vapour barrier |